esp6 ing6     WEBMAIL

                            

Inspection Planning

The Risk Based Inspection analysis is based on the methodology proposed by API Standard 580/581, where the operational risk of static equipments subjected to pressure are evaluated.

The Reliability of the equipment is estimated during the design stage; however, variations in the working regimes and demands through its lifespan can vary the estimated failure frequency of its components.

How to deal with a report of intelligent internal inspection? treatment should be given in programmed way to the findings identified (dents, corrosion defects, cracks, etc.).